• Twitter
  • Facebook
  • Google+
  • RSS Feed

Friday, 21 November 2014

Studio Shoot 9- Set build 3 (continued)

No comments:
 
During today's set build I helped create the fake brick walling for the prison where our actor is going to break out of. This was done by putting clay on and then eventually painting fake blocks of foam that Chloe had purchased previously.






I them got involved with helping Nick cover and stick the bits of paper previously ripped out from the books kindly donated by a local charity to the wall. The end result looked interesting

  

No comments:

Post a Comment

 
© 2012. Design by Main-Blogger - Blogger Template and Blogging Stuff